So while this cycle does it's thing I'm gonna get some shit in order to get the room finished up how I want it. Gonna order up some more light parts, see if the hydro shop can get me a couple of 3x6 od tables, and figure out how I want to run the automated water system.
Plan is to have everything ready to go so when I harvest I can get in there and glue up some FRP panels or similar, put some wall base down to seal the bottoms of the walls better, and get the tables in and lights hung without too much down time.
Hopefully I can chain up the carbon filter tighter to the ceiling, and have enough room to squeeze in for defoliation/training ect.
My brother was over on a day I had to water & he asked if I needed help & at first I said yes. Until we both tried going in & out of the rooms. I literally built the new space around just my needs including work space. There's no room for anyone but me & plants to be in there lol.Now that I'm thinking about it I might mock something up with some boxes or something to make sure I will fit lol. I have 7 1/2 ft of width, so with the 3x6od tables I should have 1 1/2 ft between them. I'm not particularly small, or flexible, so I should make sure I'm not fucking myself over lmao
It should only cost about $120 or so to do for my small room, and I thing the ease of cleaning will make me forget the cost pretty quick lol.I've always wanted to finish a room in frp. That stuff is awesome.
Pretty much the same deal here lol, if anyone wants to see what's going on in there it's a one at a time situation. How the doors interact get people every time. Gotta explain the order of operations to get in lmao.My brother was over on a day I had to water & he asked if I needed help & at first I said yes. Until we both tried going in & out of the rooms. I literally built the new space around just my needs including work space. There's no room for anyone but me & plants to be in there lol.